snow is firm now so maybe the dam airbox wont get snow on it and freeze up so pipes are on again, to much work to swap out again so there staying on .Installing my pipes again and noticed the wiring on the hood about 1/4 to half way up is got the tape melted already and the pipes were only on for about an hours use last time,are the wires suppose to be relocated or is that where they are suppose to be?nothing worse than melting stuff
Last edited: