I put the rear heat exchangers in. What a PIA I broke 4 drill bits trying to drill out the rivets. So I grinded them off took forever. Then I had to cut the white plastic things that run along the underside od the tunnel they were 1 inch to long. Used my Dremmel went through 6 metal plastic cutting discs. to cut 4 plastic pieces. So this weekend should be good and not overheat. We will probably have crappy snow up in Gaylord considering it was 58 degrees in Toledo 2 days ago. It will be a good test for the sleds. Are there any good ways to get rivets out, grinding works by it takes a while.