SXR progress

yamyrider

Active member
Joined
Nov 6, 2003
Messages
1,598
Age
56
Location
Northern Ontario
so far I replaced 1 piston and all rings. Installed a 2 inch bar riser, Aaen pipes,
painted the front springs and trailing arms. Replaced the three bolts and washers behind the secondary and cleaned the clutch.
Still have the primary to rebuild and clean, jetting, and some skid work.
I am also replacing thr skis with ATS blue skis with black loops.
Oh ya I also replaced the rope in the recoil.
It is gonna need a good scrubing and shine after.
 

Attachments

  • bar riser.jpg
    bar riser.jpg
    194.1 KB · Views: 25
  • pipes.jpg
    pipes.jpg
    230.4 KB · Views: 40
  • SXR.jpg
    SXR.jpg
    139.8 KB · Views: 23

I ordered my new skis. Took the skid out and repainted some parts, greased, installed new sliders and will put the polaris idler wheels as well.
I put some cool blue LED's under the machine. Waiting for my SRX rear exchanger to come in and then the big clean up begins.
Check my parts for sale in the classifieds.
I will post some updated pictures soon.
 
this sucks.

Work has come to a stand still for awhile on my machine.
Had surgery yesterday and the doc tells me I need about 7 to 10 days rest.
There is no way I can stay out of the garage that long.
 


Back
Top