yamyrider
Active member
so far I replaced 1 piston and all rings. Installed a 2 inch bar riser, Aaen pipes,
painted the front springs and trailing arms. Replaced the three bolts and washers behind the secondary and cleaned the clutch.
Still have the primary to rebuild and clean, jetting, and some skid work.
I am also replacing thr skis with ATS blue skis with black loops.
Oh ya I also replaced the rope in the recoil.
It is gonna need a good scrubing and shine after.
painted the front springs and trailing arms. Replaced the three bolts and washers behind the secondary and cleaned the clutch.
Still have the primary to rebuild and clean, jetting, and some skid work.
I am also replacing thr skis with ATS blue skis with black loops.
Oh ya I also replaced the rope in the recoil.
It is gonna need a good scrubing and shine after.