Exciterfan
Member
Well here are some photos of the progressover the summer and fall.
1) Bender pipes with new flanges welded on, manifold edges machined to prevent pipe damage, powder coated & installed.
2) Carbon Tech Reeds installed.
3) Carbs Cleaned and ready to go.
4) Fitch Fuel catalysts in the tank.
5) C&A Pro AD Skis installed (Thanks Rich)
6) M10 Installed, calibrated & adjusted (Thanks to Rich again!)
7) Team Roller Secondary (from last year).
Oh and I forgot the Seat Jack for when my sweetie wants to come for a ride (I'll have to watch the throttle!!!).
All I need is some snow so I can experiment with some clutching advice from Turk. Going to start with Turk's Primary recommendartions and see how they work with the Team Roller. May use Turk's secondary setup recommendations as a comparison and then see if I can tune the Team Roller accordingly. We'll see!
1) Bender pipes with new flanges welded on, manifold edges machined to prevent pipe damage, powder coated & installed.
2) Carbon Tech Reeds installed.
3) Carbs Cleaned and ready to go.
4) Fitch Fuel catalysts in the tank.
5) C&A Pro AD Skis installed (Thanks Rich)
6) M10 Installed, calibrated & adjusted (Thanks to Rich again!)
7) Team Roller Secondary (from last year).

All I need is some snow so I can experiment with some clutching advice from Turk. Going to start with Turk's Primary recommendartions and see how they work with the Team Roller. May use Turk's secondary setup recommendations as a comparison and then see if I can tune the Team Roller accordingly. We'll see!