unloading
The bottom deck we pull the sleds off the right front or off the back with our loading ramp. The rear 10' of the top deck has two hydralic cyls that we modified to work off of the Power Steering pump to tilt down at the rear to rest on the bottom deck, then we pull them down the back onto the loading ramp.The loading ramp has a cradle under the bottom deck for storage. It has 7 Air Ride Bucket Seats in the rear and one for the last guy back who has to drive, Wabasco heater for the doo boys, color tv, 6 disc sound system and an rebuilt Int 466 Turbo diesel on propane. A good 8 sled hauler. I'll see if I can find pics of how we load and unload, either process takes about 10 -15 minutes for 8 sleds to load or unload.