kgwmu
New member
I started by creating a CAD layout to determine where the front hole should be. This made it easy to drill the hole later on.
Step 1: remove the skid and seat.
Step 2: drill out the rivets that hold on the rear skid mounting plate.
Step 3: use the temple from CB performace to mark the hole locations on the drop bracket then drill the holes. (I had already started to drill one of the holes in the picture)
Step 4: install the drop bracket with the nut and bolt provided, then follow the holes that you drilled in the bracket and drill through the tunnel and install the rivots.
Step 5: drill the new hole for the middle mounting point. The hole should be 1.5" straight down and 0.10" towards the front of the sled. I created a paper templete to use it looked like the following. Hopefully this will also clear up the front to back hole movement. The two large circles are the current mounting holes front and middle.
Step 6: I installed the rear first then the middle, it was difficult, doing the middle first might be easier.
Step 1: remove the skid and seat.
Step 2: drill out the rivets that hold on the rear skid mounting plate.

Step 3: use the temple from CB performace to mark the hole locations on the drop bracket then drill the holes. (I had already started to drill one of the holes in the picture)


Step 4: install the drop bracket with the nut and bolt provided, then follow the holes that you drilled in the bracket and drill through the tunnel and install the rivots.


Step 5: drill the new hole for the middle mounting point. The hole should be 1.5" straight down and 0.10" towards the front of the sled. I created a paper templete to use it looked like the following. Hopefully this will also clear up the front to back hole movement. The two large circles are the current mounting holes front and middle.

Step 6: I installed the rear first then the middle, it was difficult, doing the middle first might be easier.