Well little by little its comming together. In between work and up north got some stuff done. Got the engine back together with the viper reeds and cages. Chain case back together. New clutch kit installed. Going with the turk set up for 600 twins. A 50/44 helix (micro belmont) green secondary spring at 60deg, and 8AB weights with 2.4g rivets in all holes. Really looking forward to see what this little twin does. Got the HID's installed and awesome again. I love these kits from DDM. They are really quality stuff and plug and play. I hope to get the skid done (BTV treatment) and installed tomorrow. If i do there is just enough snow on the ground for a ride around the yard. Few pic's of today