base bolts are 20 ft-lb. the head bolts 16 ft-lb. each set of two heads has sequence. go side to side when torqueing. #1 bolt will be first bolt in middle of head, #2 will be on other head at front. and so on. there are 10 nuts total per head set. 3:16 (yammie tony)